November 28, 2026
  • 9:06 pm FREE Cycling Activities and rides
  • 4:15 pm London Cycling Festival 2026 – What’s on in Brent?
  • 7:15 pm The Healthy Streets Scorecard: Slow progress on Healthy Streets in Brent
  • 5:35 pm What the Brent Council elections mean for Active Travel: Part 2
  • 2:32 pm What the Brent Council elections mean for Active Travel: Part 1
  • 5:31 pm Brent Council’s Bike Nests
A person riding a Lime bike at the London Loves Cycling ride. Courtesy London Cycling Campaign.

Updated 7th November: An agreement between Brent Council and Lime has been reached, see below.

Brent Council recently announced a deadline of 31 October 2024 for the shared e-Bike operator Lime to remove all e-Bikes from Brent. This comes after the failure of Brent Council and Lime to reach an agreement. We responded to this story in the Evening Standard on the 3rd September, and you can read our full statement below:

Brent Cycling Campaign is disappointed in this decision to ban popular shared bikes in Brent. Lime and Brent Council must work together and stop this counterproductive blame game. As the highway authority, Brent Council has the power to solve the challenges around shared e-bike parking: the solution is to provide sufficient marked bike parking areas on the road in problem areas (see London Cycling Campaign’s position), enforced in collaboration with the hire bike operator. We are surprised, given that other London boroughs have successfully addressed this issue for some time. Removing a popular zero emissions transport option is not the answer.

You can find the original Council motion on Brent Council’s website here, and read some of the other reports here as the story develops:
Brent & Kilburn Times, 2nd September 2024.
Evening Standard, 3rd September 2024.
Brent & Kilburn Times, 3rd September 2024.
BBC, 4th September 2024.
BBC, 9th September 2024.
Brent & Kilburn Times, 11th September 2024.
Brent & Kilburn Times, 14th September 2024.
The Guardian, 15th September 2024.
Updated 24th September:
NWLondoner, 20th September 2024.
Brent & Kilburn Times, 24th September 2024.

Updated 19th October:
In the latest news common sense seems to have prevailed: Brent Council will install designated shared e-bike parking bays across the borough, funded by the shared e-bike operator. This is what Brent Cycling Campaign called for in our public statement on 3rd September, and is the recommendation of the London Cycling Campaign in problem areas. We hope that Brent Council will quickly identify sufficient parking space, on the road not the pavement, across the borough to ensure that shared cycle hire remains the popular and flexible mode of transport for people who may not have access to secure cycle parking at home.
Meanwhile, Camden Council have confirmed that banning shared e-cycle hire is not a solution to problem parking behaviour, and that TfL will soon take over management of dockless e-bike operator agreements, rather than each borough being required to come to an individual agreement.
Brent & Kilburn Times, 3rd October 2024.
Brent & Kilburn Times, 4th October 2024.
Camden New Journal, 15th October 2024.

Updated 7th November 2024:
Brent Council have now confirmed that 200 parking bays for shared e-bikes will be installed in priority areas before July 1 2025. In an agreement with Lime, the e-bike operator will fund the installation and implement other measures to ensure shared hire bikes are parked appropriately. This is a positive outcome: as we at Brent Cycling Campaign called for shared e-bikes will remain available to Brent residents, and parking restrictions will be limited to priority areas while the flexibility of dockless parking is expected to remain in the rest of the Borough. However, the proposal for only 200 parking bays, and a reduction in the total number of bikes is counterproductive, in contrast with the over 31,000 parking permits Brent Council issues annually.
BBC London, 31st October 2024.
Harrow Online, 1st November 2024.
The Standard, 2nd November 2024.

Updated 10th November 2024:
Recent Brent Council agenda pack for the meeting of the 18th November gives additional details of the agreement between Brent Council and Lime. In response to a question from Councillor Choudry, the Brent Cabinet Member for Environment & Enforcement, Councillor Krupa Sheth, stated that:

“As a result of negotiations with Lime Bikes, they [Lime] have committed to a new operating plan:

  • They will invest £350k to create 200 bike parking bays.
  • These will become mandatory for users when complete from July 2025.
  • Their fleet is to be reduced by a third from 750 bikes to 500, until the new parking bays are in place and complaints have been addressed.
  • They will ban the parking of bikes where misuse is severe and parking poor (we’re [Brent Council] working on these areas with the highest complaints).
  • Introduce automatic speed controls in busy hotspots.
  • Their operational staff on the ground will increase from 14 to 24 to improve responsiveness.
  • Agreed KPIs including the removal of inappropriately parked bikes when reported within 2 hours.
  • Reinvesting fines from poor parking back into the community through the Together Towards Zero grant scheme.
  • Launching a new resident forum to meet on a quarterly basis and provide a cycle training session each month for residents.
  • Working to commence immediately on a revised MoU.
  • A new and separate email address for Councillors to contact Lime.
  • Weekly operational meetings for the first few months to ensure improvements are in place and working, then a review with a possible move to monthly monitoring meetings.”
Brent Cycling Campaign

RELATED ARTICLES

2 COMMENTS

  1. Di H Posted on September 19, 2024 at 9:20 pm

    Well done Brent Cyclists for pointing out the other side of the issue Also specifying what Brent should be doing to prevent the loss of the Lime bikes to those who rely on them and the benefits for air quality.

    Reply
  2. J Posted on May 24, 2025 at 11:21 pm

    As a cyclist, I disagree with this article. Enforcing new parking rules wont fix the inherent issue that lime bikes are electric bikes.

    They attract users who cant cycle, but will go at reckless speeds. For the longest time, i was most afraid of vans and lorries whilst cycling. With cycle lanes these arent really an issue. But lime bikes share bike paths and the number of near miss accidents ive had with lime bike users. Im even more terrified of them as a pedestrian.

    I’m not against against increased cyclists. That is a solved problem- boris bikes and their fixed docks. We just needed more docks. But somehow weve let a californian tech company funnel away money that could have been invested into our public transport. If e bikes are to exist, they should need a cbt like a moped.

    Found this article because of a near miss with a lime bike user and was excited to find out that brent had the guts to take action against lime, but sadly they caved…

    Reply
LEAVE A COMMENT

This site uses Akismet to reduce spam. Learn how your comment data is processed.