March 19, 2024
  • 9:06 pm FREE Cycling Activities and rides
  • 3:24 pm Wembley Central to Willesden Junction Cycleway: A Significant Opportunity for Better Walking and Cycling in Brent
  • 6:59 pm Wembley to Willesden Junction walking and cycling changes
  • 10:00 pm AGM 2023
  • 12:31 pm Climate Ambassadors
  • 8:28 pm Church End Growth Area Master Plan

This is the BCC response, 6 March 2020, to this consultation. This is the response from Brent Cycling Campaign, the local group of the London Cycling Campaign (LCC) in Brent, representing approximately 250 LCC members in the borough, and anyone else who wishes to improve conditions for cycling and walking locally. Our opposition to this […]

READ MORE

This is the response of Brent Cyclists to the consultation on Kingsbury Town Centre Proposed Public Realm Improvements Scheme (closed 1 December 2017). We approve of this scheme, which is a major improvement on previous proposals, and on the existing design, but have some concerns on the design of the cycle facilities, as follows. 1) Surface […]

READ MORE

This is a response to this consultation, that closed on 7 April 2017. This is the response from Brent Cyclists, the Brent Group of the London Cycling Campaign (LCC). We represent around 200 members in Brent, and aim to represent the interests of all who cycle or would like to cycle in NW London. We […]

READ MORE

Following the advent of the Carlton Vale cycle scheme in Kilburn, we have also been hoping to get a similar high-quality cycling scheme in the north of the borough, and last year consultancy Urban Movement produced an excellent redesign of Kingsbury Road incorporating segregated cycle tracks on both sides (to replace the current short, ineffective pavement track on one side). […]

READ MORE