March 19, 2024
  • 9:06 pm FREE Cycling Activities and rides
  • 3:24 pm Wembley Central to Willesden Junction Cycleway: A Significant Opportunity for Better Walking and Cycling in Brent
  • 6:59 pm Wembley to Willesden Junction walking and cycling changes
  • 10:00 pm AGM 2023
  • 12:31 pm Climate Ambassadors
  • 8:28 pm Church End Growth Area Master Plan

Response from BCC 28 February 2020 to this consultation. This is the response from Brent Cycling Campaign, the local group of the London Cycling Campaign (LCC) in Brent, representing approximately 250 LCC members in the borough, and anyone else who wishes to improve conditions for cycling and walking locally. We feel the need to ‘disagree’ […]

READ MORE

Brent Council consulted on changes to Church Lane NW9. Proposing a speed table at this location. Brent Cycling Campaign opposed this scheme and responded as follows.

READ MORE

We recently responded to Brent Council’s Draft Third Local Implementation Plan (LIP3). LIPs are one of the main routes for council funding outside of specific TfL schemes. The London Cycling Campaign has a a lot of guidance on LIPs and how to respond as a local group. We responded in detail to the relevant sections […]

READ MORE

This is the response from Brent Cyclists to this consultation. Brent Cyclists is the local group of the London Cycling Campaign. We represent directly about 200 paid-up members who live in the borough, and we also attempt to represent all those who cycle or would like to cycle in the borough. We agree with this scheme. […]

READ MORE

A response to this consultation, closed 15 December 2017. Do you agree with the proposed 20 mph zone? Yes Do you agree with the proposed zebra crossing facility near junction with East lane and three zebra crossings at The Avenue junction with Preston Road? Yes Do you agree with the proposed four uncontrolled crossing facilities […]

READ MORE