Brent Cycling Campaign have a regular column in the Brent & Kilburn Times. You can read our column from September 2025 below.
Brent Council plans to upgrade Quietway 3, also known as the Jubilee Line Quietway, which runs from Gladstone Park to Kilburn High Road. But apart from a few painted cycle symbols and the long-standing filter on Chatsworth Road near Willesden Green Station you might be surprised that this is even a cycle route. Unfortunately, Brent’s proposed “upgrades” will make few improvements to cycling safety, and might even make the route less inviting.

The filter on Chatsworth Road near Willesden Green Station.
Good cycle routes should be safe, direct, convenient, and suitable for all. When cycling people should feel safe, this includes protecting people cycling from motor traffic. One advantage of cycling is momentum, but this needs direct routes without unnecessary stops and starts. Convenient routes are continuous and easy to use. While routes suitable for all consider every type of cycle and cyclist, from parents with children to people using their cycle as a mobility aid.
Quietway 3 will not be safe, direct, convenient, or suitable for all. Brent Council claims to have reviewed the route according to TfL’s New Cycle Route Quality Criteria; however, the route continues to follow and cross roads with high volumes of traffic including Mapesbury Road, Park Avenue North, and Walm Lane, with no changes to mitigate these motor traffic volumes. As part of the upgrade Brent will introduce 4 new parallel crossings: people cycling must divert onto a shared pavement, cross next to a zebra crossing, then rejoin the road after a junction. This is neither direct nor convenient, and puts people cycling into unnecessary conflict with people walking, instead cycles must be treated as vehicles and not as pedestrians. The number of new turns, narrow pavements, and complicated junctions will make the upgraded route uncomfortable for people new to cycling and unsuitable for people using larger cycles such as adaptive cycles.
Instead Brent Council must review the scheme to make it truly safe, direct, convenient, and suitable for all. If the route continues to follow Park Avenue North, safe protected cycle infrastructure is needed, in particular at the railway bridge. Instead of diversions at each road junction, Brent should reduce motor traffic on Chatsworth Road and St Pauls Avenue, and where safer crossings are needed Brent can follow TfL design standards and introduce traffic lights on Walm Lane.
Without these changes the Quietway 3 will be neither quiet, nor meet TfL quality criteria for cycling.
Related
RELATED ARTICLES
1 COMMENTS
This site uses Akismet to reduce spam. Learn how your comment data is processed.



Regardless of the the proposed upgrades to Quietway 3 being completely inadequate – there is a much larger issue which is “where is QW3 supposed to go to?” When it was originally planned – back in 2018 – was originally planned to extend into West Hampstead and then into Regents park – which makes absolute sense since this is a useful route into Central London and then onto the rest of the London cycle network. However – Brent never made the connection into West Hampstead and the planned Cycle Super Highway on Finchley road was also never completed, so now QW3 – is a literal road to nowhere..
If these proposals are to be in any way meaningful – as well as looking at the points raised above – some consideration of how useful this route is and how it connects to the rest of the cycle network should be considered..